Waste Management & Research

 

Advanced Search

Journal Navigation

Journal Home

Subscriptions

Archive

Contact Us

Table of Contents

Click here for more information

Sign In to gain access to subscriptions and/or personal tools.
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Add to Saved Citations
Right arrow Download to citation manager
Right arrowRequest Permissions
Right arrow Request Reprints
Right arrow Add to My Marked Citations
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Pelkonen, M.
Right arrow Articles by Rintala, J.
Right arrow Search for Related Content
PubMed
Right arrow Articles by Pelkonen, M.
Right arrow Articles by Rintala, J.
Social Bookmarking
 Add to CiteULike   Add to Connotea   Add to Del.icio.us   Add to Digg   Add to Reddit   Add to Technorati  
What's this?
Waste Management & Research, Vol. 17, No. 6, 493-497 (1999)
DOI: 10.1177/0734242X9901700614

Biological nitrogen removal from landfill leachate: a pilot-scale study

Markku Pelkonen

Helsinki University of Technology, Laboratory of Environmental Engineering, Helsinki, Finland

Mikko Kotro

Helsinki University Development Services, Koetilantie 3, FIN-00710 Helsinki, Finland

Jukka Rintala

University of Jyvaskyla, Department of Biological and Environmental Science, Jyvaskyla, Finland

A pilot-scale two-stage process including an anaerobic pretreatment (up-flow anaerobic sludge blanket, UASB) unit and a pre-denitrification activated sludge process was studied for treating leachates from a municipal landfill (waste aged 4 to 5 years, area 2.5 ha) and from a windrow composting area (1ha). A single-stage pilot process was used for nitrification studies. The leachate characteristics were as follows: COD 740 to 2400 mg 1-1 (chemical oxygen demand), BOD7 (biochemical oxygen demand) approximately 1000 mg 1 -1, Ntot 40 to 120 mg 1-1 and the temperature was between 2 and 21°C. The results show that 45 to 50% COD removal could be achieved in the UASB reactor even at temperatures below 10°C. The activated sludge process was operated with a 1.1 to 2.2 d hydraulic retention time and at between 8 and 21°C. The removal efficiencies were 80 to 90% for COD, over 98% for BOD7, over 90% for NH4-N and over 70% for Ntot The dependence of denitrification efficiency on leachate biodegradable COD fraction and COD to N ratio was evaluated. Overall treatment efficiencies were good and applicable for design purposes. The total costs were estimated for a full scale pre-denitrification process at FIM 10 to 20 m-3 and FIM 50 to 90 (kg N removed)-1 (3.5 to 7 DM m-3 and 17 to 30 DM [kg N removed] -1) for a landfill representing circumstances in Southern Finland with an annual average flow of 50 m3 d-1.

Key Words: Anaerobic pretreatment • biological treatment • costs • landfill leachate • low temperature • nitrogen removal • seasonal variation


Add to CiteULike CiteULike   Add to Connotea Connotea   Add to Del.icio.us Del.icio.us   Add to Digg Digg   Add to Reddit Reddit   Add to Technorati Technorati    What's this?