Waste Management & Research

 

Advanced Search

Journal Navigation

Journal Home

Subscriptions

Archive

Contact Us

Table of Contents

Click here to sign up for SAGE Journal Email Alerts today!

Sign In to gain access to subscriptions and/or personal tools.
This Article
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Add to Saved Citations
Right arrow Download to citation manager
Right arrowRequest Permissions
Right arrow Request Reprints
Right arrow Add to My Marked Citations
Citing Articles
Right arrow Citing Articles via HighWire
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Stearns, R.P.
Right arrow Articles by Petoyan, G.S.
Right arrow Search for Related Content
PubMed
Right arrow Articles by Stearns, R.P.
Right arrow Articles by Petoyan, G.S.
Social Bookmarking
 Add to CiteULike   Add to Connotea   Add to Del.icio.us   Add to Digg   Add to Reddit   Add to Technorati  
What's this?
Waste Management & Research, Vol. 2, No. 1, 75-83 (1984)
DOI: 10.1177/0734242X8400200107

Utilization of Landfills as Building Sites

R.P. Stearns

4014 Long Beach Boulevard, Long Beach, California 90807, U.S.A.

G.S. Petoyan

4014 Long Beach Boulevard, Long Beach, California 90807, U.S.A.

Landfill gas (LFG) control measures and operating experience are described for two landfill sites which have been developed in the City of Carson, California. Investigations began in 1975 to develop a completed 10.5-ha Class II landfill site (household and commercial wastes) as a six-screen drive-in theatre including projection and concession facilities. LFG control facilities include 30 extraction wells for on-site protection, 19 perimeter extraction wells for migration control, blower/flare facilities and a subslab membrane and automatic gas detection system for backup protection during active system downtime.

Investigations for the second site began in 1977 to develop 3.8 ha of a 7.2-ha Class II landfill site as a truck sales and service centre. LFG control facilities include 14 extraction wells, blower/flare facilities and a subslab membrane.

Ongoing operation and maintenance of LFG control facilities is required at both sites to permit continued site occupancy. Activities include blower/flare maintenance, well field monitoring and adjustment, site settlement inspection and repair, monitoring system calibration and maintenance, etc.

Buildings at both locations are supported on foundation piles driven through the former landfilied materials.

Key Words: Landfill gas (LFG) • gas control • extraction wells • subslab membranes • buildings on landfills • gas monitoring • operation and maintenance • subsurface fire • landfill settlement • cost.


Add to CiteULike CiteULike   Add to Connotea Connotea   Add to Del.icio.us Del.icio.us   Add to Digg Digg   Add to Reddit Reddit   Add to Technorati Technorati    What's this?


This article has been cited by other articles:


Home page
Waste Manag ResHome page
J.R. Emberton and A. Parker
The Problems Associated With Building On Landfill Sites
Waste Management Research, January 1, 1987; 5(1): 473 - 482.
[Abstract] [PDF]


Home page
Waste Manag ResHome page
R. P. Stearns and G. S. Petoyan
Identifying and Controlling Landfill Fires
Waste Management Research, January 1, 1984; 2(1): 303 - 309.
[Abstract] [PDF]